THE IMPACT OF MATERIAL REQUIREMENT PLANNING IN MANUFACTURING INDUSTRY

THE IMPACT OF MATERIAL REQUIREMENT PLANNING IN MANUFACTURING INDUSTRY
(A Case Study of Peugeot Automobile Nigeria Plc, Kakuri Branch Kaduna)

Click here to download our android mobile app to your phone  for more materials and others

COMPLETE PROJECT  MATERIAL COST 5000 NAIRA OR $10 , 

. A FRESH TOPIC NOT LISTED ON OUR WEBSITE COST 50,000 NAIRA ( UNDERGRADUATE) OR 100,000 FOR SECOND DEGREE STUDENTS. $500. PLUS  FREE SUPPORT UNTIL YOU FINISH YOUR PROJECT WORK. CONTACT US TODAY, WE MAKE A DIFFERENT. DESIGN AND WRITING IS OUR SKILLED.  DESIGN AND WRITING IS OUR SKILLED.

Note: our case study can be change to suit your desire location . we are here for your success.

                                   ORDER NOW

MAKE YOUR PAYMENT  INTO ANY OF THE FOLLOWING BANKS:
 GTBANK
Account Name : Chi E-Concept Int’l
ACCOUNT NUMBER:  0115939447
First Bank:
Account Name: Chi E-Concept Int’l
Account Name: 3059320631

Foreign Transaction For Dollars Payment :
Bank Name: GTBank
Branch Location: Enugu State,Nigeria.
Account Name: Chi E-Concept Int’l
 Account Number:  0117780667. 
Swift Code: GTBINGLA 
Dollar conversion rate for Naira is 175 per dollar. 

ATM CARD:  YOU CAN ALSO MAKE PAYMENT USING YOUR ATM CARD OR ONLINE TRANSFER. PLEASE CONTACT YOUR BANKER SECURITY GUIDE ON HOW TO TRANSFER MONEY TO OTHER BANKS USING YOUR ATM CARD. ATM CARD OR ONLINE BANK TRANSFER IS FASTER FOR QUICK DELIVERY TO YOUR EMAIL . OUR MARKETER WILL RESPOND TO YOU ANY TIME OF THE DAY. WE SUPPORT CBN CASHLESS SOCIETY. 

OR
PAY ONLINE USING YOUR ATM CARD. IT IS SECURED AND RELIABLE.

Enter Amount

form>DELIVERY PERIOD FOR BANK PAYMENT IS  LESS THAN 2 HOURS

How to transfer from your bank account to All  Nigeriabanks

1. Access Bank:
—-*901#

2. EcoBank:
—-*326#

3. Fidelity Bank:
—-*770#

4. FCMB:
—-*389*214#

5. First Bank
—-*894#

6. GTB:
—-*737#

7. Heritage Bank:
—-*322*030#

8. Keystone Bank:
—-*322*082#

9. Sky Bank:
—-*389*076*1#

10. Stanbic IBTC:
—-*909#

11. Sterling Bank:
—-*822#

12. UBA:
—-*389*033*1#

13. Unity Bank:
—-*322*215#

14. Zenith Bank:
—-*966#

15. Diamond Bank
—-*710*555#

To know your BVN, dial
—-*565*0#.

E.g for First bank…   *894 *Amount *Acct. No. #

Please dail d code from d number u used to register d account from the bank

CALL OKEKE CHIDI C ON :  08074466939,08063386834.

AFTER PAYMENT SEND YOUR PAYMENT DETAILS TO

08074466939 or 08063386834, YOUR PROJECT TITLE  YOU WANT US TO SEND TO YOU, AMOUNT PAID, DEPOSITOR NAME, UR EMAIL ADDRESS,PAYMENT DATE. YOU WILL RECEIVE YOUR MATERIAL IN LESS THAN 2 HOURS ONCE WILL CONFIRM YOUR PAYMENT.

WE HAVE SECURITY IN OUR BUSINESS.   

MONEY BACK GUARANTEE

 

 

TABLE OF CONTENTS

CHAPTER ONE: INTRODUCTION
1.1 Background of the Study. – – – – – – 1
1.2 Statement of the Problems- – – – – – – 4
1.3 Objectives of the Study – – – – – – – 4
1.4 Statement of Hypothesis – – – – – – – 5
1.5 Significance of the Study – – – – – – 5
1.6 Scope of the Study – – – – – – – 6
1.7 Limitations of the study – – – – – – – 6
1.8 Historical Background of PAN – – – – – 7
1.9 Definition of Terms – – – – – – – 10

CHAPTER TWO: LITERATURE REVIEW
2.1 The Concept of Materials Requirement Planning – – – 12
2.2 Materials Requirement Planning (MRP) objectives – – – 15
2.3 Materials Requirement Planning (MRP) as a Planning Tool – 16
2.4 Methodology of a MRP project implementation/Alternative
Techniques – – – – – – – – 19
2.5 Material Requirement Planning (MRP) Inputs – – – 20
2.6 Organizational Measures for Effective Material Requirement Planning Implementation – – – – – – – – 22
2.7 Master Production Scheduling (PP-MP-MPS) and MRP – – 25
2.8 Benefits of Material Requirement Planning (MRP) – – 28
CHAPTER THREE:
RESEARCH METHODOLOGY
3.1 Research Design – – – – – – – – 31
3.2 Research Population – – – – – – – 32
3.3 Sample Size and Sampling Techniques – – – – 32
3.4 Methods of Data Collection – – – – – – 33
3.5 Justification for the Instrument Used – – – – – 34
3.6 Method of Data Analysis – – – – – – 34
3.7 Justification of Method Used – – – – – – 34
CHAPTER ONE
INTRODUCTION
1.1 BACKGROUND OF THE STUDY
Production is the transformation of one set of resources into a second set. In order to describe the constraints and opportunities for production, different methods have been developed through the years both in the practical engineering context and from an academic point of view (Grubbström, 1995). For the multi-level, multi-stage production-inventory system, an analysis applying the combined methodology of input-output analysis and the place transform has proven to be useful.
In practice, the managerial information system dealing with multi-level, multi-stage production-inventory systems is referred to as Material Requirements Planning (MRP). Here, product complexity as well as lead times are essential ingredients. In this research we allow these terms to be used in a synonymous way both for the theoretical analysis and as a name for the corresponding practical information system.
In a multi-level manufacturing system finished products, subassemblies, components, raw materials, etc., (items), are distinguished. MRP reduces a master production schedule of finished products into a time-phased suggested schedule of requirements of intermediate items to be manufactured and purchased, based on the estimated external demand for finished products. This “parts explosion” determining requirements from higher levels down to lower levels (upstream to downstream) traces the product structures.
Material Requirements Planning (MRP) is a computer-based inventory management system designed to assist production managers in scheduling and placing orders for dependent demand items. Dependent demand items are components of finished goods—such as raw materials, component parts, and subassemblies—for which the amount of inventory needed depends on the level of production of the final product. For example, in a plant that manufactures bicycles; dependent demand inventory items might include aluminium, tires, seats, and derailleurs.
The first MRP systems of inventory management evolved in the 1940s and 1950s. They used mainframe computers to explode information from a bill of materials for a certain finished product into a production and purchasing plan for components. Before long, MRP was expanded to include information feedback loops so that production personnel could change and update the inputs into the system as needed. The next generation of MRP, known as manufacturing resources planning or MRP II, also incorporated marketing, finance, accounting, engineering, and human resources aspects into the planning process. A related concept that expands on MRP is enterprise resources planning (ERP), which uses computer technology to link the various functional areas across an entire business enterprise.
MRP works backward from a production plan for finished goods to develop requirements for components and raw materials. “MRP begins with a schedule for finished goods that is converted into a schedule of requirements for the subassemblies, component parts, and raw materials needed to produce the finished items in the specified time frame,” William J. Stevenson wrote in his book Production/Operations Management. MRP breaks down inventory requirements into planning periods so that production can be completed in a timely manner while inventory levels—and related carrying costs—are kept to a minimum. Theoretically, it is often asserted that, when implemented and used properly, MRP can help production manager’s plan for capacity needs and allocate production time. However, it is also argued that MRP systems can be time consuming and costly to implement, which may put them out of range for some small businesses. In addition, the information that comes out of an MRP system is only as good as the information that goes into it. Thus, for MRP to be successfully implemented and sustained, current accurate bills of materials, part numbers, and inventory records must be maintained. These and similar, issues relating to the concept and practice of MRP is what this research work intends to examine.
1.2 STATEMENT OF THE PROBLEMS
As stated earlier, MRP is a planning technique designed to assist production manager in scheduling and placing orders for dependent demand items such as raw materials, component parts and sub-assemblies relative to the desired level of production. However, it has been observed that the technique is not yet very popular among organization. Not only that, it is also argued that the system is so time consuming and costly that not every organization can adopt it.

In this research work, attempts have been made to critically assess the possible contribution of the MRP technique to the

Share This:

Leave a Reply